- No. of beneficiaries..The targeted area is within the irrigation scheme of Ghadeer Al Boustan Dam (10.8 MM3).
- Project Main Activities
Activity A
Rehabilitation of farmers’ field irrigation system in Gadeer Al Bustan
The targeted area is within the irrigation scheme of Ghadeer Al Boustan Dam (10.8 MM3). The work includes:
1-Light rehabilitation for the main open channel flow (1.5 m3/s , length 25 km, flume structure, rectangular, and trapezoidal Vsections), and the water intakes on the main canal in order to let water flow through and reach branched field irrigation canals
2-Rehabilitation of field irrigation canals downstream Nawa
Activity B
Rehabilitation of 5 groundwater wells for farmers of small-scale agricultural activities in green belt areas: Al Kokliah, El-Taebah geezah, Mktal albint, Nassib alfayiz, and Umahat Al Yadudah groundwater wells.
1-Rehabilitation and installation of submersible pump with electric motor and related fittings and accessories
2-Solar power system for pumping ground water