- No. of beneficiaries..
- Al Kokliah Well 216 m3/day
- El-Taebah geezah well 480 m3/day
- Mktal albint well -Al Badia 240 m3/day
- Nassib alfayiz well
- Umahat Al Yadudah well 240 m3/day
![](https://rk-group.net/wp-content/uploads/2023/10/1-32.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/02.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/03.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/3-17-scaled.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/06.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/04.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/6-10.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/07.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/08-scaled.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/09.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/11-6.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/12-8.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A5367.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A6656.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A7194.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A7223-scaled.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A8105.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A8153.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A8100.jpg)
![](https://rk-group.net/wp-content/uploads/2023/10/JD3A7589.jpg)
- Project Description
Activity A:
Rehabilitation of farmers’ field irrigation system in Gadeer Al Bustan
The targeted area is within the irrigation scheme of Ghadeer Al Boustan Dam (10.8 MM3). The work includes:
1-Light rehabilitation for the main open channel flow (1.5 m3/s , length 25 km, flume structure, rectangular, and trapezoidal sections), and the water intakes on the main canal in order to let water flow through and reach branched field irrigation canals
2-Rehabilitation of field irrigation canals downstream Nawa
Activity B
Rehabilitation of 5 groundwater wells for farmers of small-scale agricultural activities in green belt areas: Al Kokliah, El-Taebah geezah, Mktal albint, Nassib alfayiz, and Umahat Al Yadudah groundwater wells.
Rehabilitation of 5 groundwater wells for farmers of small-scale agricultural activities in green belt areas: Al Kokliah, El-Taebah geezah, Mktal albint, Nassib alfayiz, and Umahat Al Yadudah groundwater wells.
1-Rehabilitation and installation of submersible pump with electric motor and related fittings and accessories
2-Solar power system for pumping ground water